The DEC has announced that the Village of New Paltz will be awarded $246,365.00 for the Replacement of Culvert Systems.
This project will improve intermittent stream flow and movement of fish and wildlife by replacing a deteriorated culvert system with adequately-sized drainage structures at a road and rail trail crossing adjacent to the Wallkill River. The new system also will improve the flow of floodwater, and maintain habitat connections for eel and other Species of Greatest Conservation Need (SGCN) such as wood turtle.
The DEC has announced that the Village of New Paltz will be awarded $246,365.00 for the Replacement of Culvert Systems.